NEWwbztv-small wbz-am-small 985-small mytv38web2

Local

Callahan Tunnel To Close Overnight For Paving Work

View Comments
The tunnel opened just before 5 a.m. (WBZ-TV)

The tunnel opened just before 5 a.m. (WBZ-TV)

Get Breaking News First

Receive News, Politics, and Entertainment Headlines Each Morning.
Sign Up

BOSTON (CBS) – The Callahan Tunnel is closing overnights this weekend for paving work at the entrance and exit.

Traffic to Logan Airport will be diverted between midnight and 6 a.m. Saturday and Sunday mornings.

Repaving work is also being done this weekend on Storrow Drive West. A portion of the road between the Bowker Overpass and the BU Bridge will be shut down from 9 p.m. Friday night until 10 a.m. Saturday morning.

Crews will return Sunday night at 9 p.m. and will work until 5 a.m. on Monday. Traffic will be detoured onto Memorial Drive.

MORE LOCAL NEWS FROM CBS BOSTON

View Comments
blog comments powered by Disqus