
The tunnel opened just before 5 a.m. (WBZ-TV)
BOSTON (CBS) – The Callahan Tunnel is closing overnights this weekend for paving work at the entrance and exit.
Traffic to Logan Airport will be diverted between midnight and 6 a.m. Saturday and Sunday mornings.
READ MORE: Mother Accused Of Putting Baby In Trash Can Charged With Attempted MurderRepaving work is also being done this weekend on Storrow Drive West. A portion of the road between the Bowker Overpass and the BU Bridge will be shut down from 9 p.m. Friday night until 10 a.m. Saturday morning.
READ MORE: Thieves Target Toyota Prius Catalytic Converters In CambridgeCrews will return Sunday night at 9 p.m. and will work until 5 a.m. on Monday. Traffic will be detoured onto Memorial Drive.
MORE NEWS: Mitt Romney Taken To Hospital For 'A Lot Of Stitches' After Fall In BostonMORE LOCAL NEWS FROM CBS BOSTON
[display-posts category=”local” wrapper=”ul” posts_per_page=”4?”]